Material | Steel |
---|---|
Finish | Nickel Plated |
Assemble | Easy To Mount On Equipment |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Steel |
---|---|
Finish | Nickel Plated |
Connection | Male Thread |
Thread | BSP,NPT,Metric Thread |
Packaging Details | exporting packaging or as required. |
Material | Steel |
---|---|
Surface Treatment | Nickel Plated |
Connection | Mount On Equipments |
Service | OEM And ODM Business |
Packaging Details | exporting packaging |
Material | Steel |
---|---|
Thread | BSP,NPT,Metric Thread |
Size | 1/2",3/8"1/4,1",11/4",11/2",13/4",2" |
Surface Treatment | Nickel Plated |
Packaging Details | exporting packaging |
Material | Steel |
---|---|
Connection | Mount On Equipments |
Finish | Nickel Plated |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |