Material | Brass Hpb57-3 |
---|---|
Thread | BSP,NPT,Metric Thread |
Finish | No Finishing |
Window | Temper Glass,Borosilicate Glass(Pyrex Glass) |
Glass Thickness | 2mm-5mm |
Material | Aluminium |
---|---|
Finish | No Finishing |
Connection | Thread |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Steel |
---|---|
Finish | Zinc Plated |
Service | OEM And ODM Business |
Packaging Details | Cartons and packing |
Place of Origin | China |
Material | Ss304, Ss316 |
---|---|
Finish | No Finishing |
Glass | Natural Glass,Tempered Glass And Borosilicate Glass |
Pressure Range | 5-10 Bar(0.5MPa To 1 MPa). |
Reflectors | Stainless Steel 304 Reflector |
Material | Brass Hpb57-3 |
---|---|
Thread | BSP,NPT,Metric Thread |
Finish | No Finishing |
Window | Temper Glass,Borosilicate Glass(Pyrex Glass) |
Glass Thickness | 2mm-5mm |
Material | Brass Hpb57-3 |
---|---|
Thread | BSP,NPT,Metric Thread |
Finish | No Finishing |
Window | Temper Glass,Borosilicate Glass(Pyrex Glass) |
Glass Thickness | 2mm-5mm |
Material | PPMA |
---|---|
Thread | BSP,METRIC THREAD |
Finishing | Natural |
Packaging Details | box, pallet |
Delivery Time | 20 work days |
Material | Brass Hpb57-3 |
---|---|
Finish | As Requirements |
Connection | Thread |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Ss304, Ss316 |
---|---|
Finish | Natural |
Connection | Thread |
Packaging Details | cartons and pallets |
Delivery Time | 45 work days |
Material | Steel |
---|---|
Finishing | Nickel Plated |
Window | Glass |
Packaging Details | exporting packaging |
Delivery Time | 45 work days |