| Material | Brass Hpb57-3 |
|---|---|
| Finish | Sandblasting,natural |
| Connection | Male Thread |
| Packaging Details | exporting packaging or as required. |
| Delivery Time | 45 work days |
| Material | Brass Hpb57-3 |
|---|---|
| Connection | Thread |
| Thread | BSP,NPT,Metric Thread |
| Finish | Natural |
| Packaging Details | exporting packaging or as required. |
| Material | Brass |
|---|---|
| Thread | NPT,BSP,METRIC THREAD |
| FINISHING | NATURAL |
| Packaging Details | box, pallet |
| Delivery Time | 20 work days |
| Material | Brass Hpb57-3 |
|---|---|
| Size | 1/2",3/8"1/4,1",11/4",11/2",13/4",2" |
| Finishing | Natural |
| Thread | NPT,BSP,Metric Thread |
| Packaging Details | exporting packaging |
| Material | Brass |
|---|---|
| Thread | NPT,BSP,METRIC THREAD |
| Size | 1/8,1/4,1/2 |
| Packaging Details | box, pallet |
| Delivery Time | 20 work days |
| Material | Brass Hpb57-3 |
|---|---|
| Finish | Sandblasting,natural |
| Connection | Male Thread |
| Packaging Details | exporting packaging or as required. |
| Delivery Time | 45 work days |
| Material | Brass Hpb57-3 |
|---|---|
| Connection | Thread |
| Finish | Sandblasting,natural |
| Packaging Details | exporting packaging or as required. |
| Delivery Time | 45 work days |
| Material | Aluminum |
|---|---|
| Finishing | Natural |
| Thread | Bsp |
| Equipment | Air Compressors, Speed Reducers,gearboxes |
| Packaging Details | box, pallet |
| Material | Aluminum Brass |
|---|---|
| Finishing | Natural No Finishing |
| Window | Tempered Glass |
| Application | Pump,oil Receivers,gearbox,speed Reducer,compressor And Power Transimission. |
| Packaging Details | exporting packaging |
| Material | Brass Hpb57-3 |
|---|---|
| Finish | No Finishing |
| Connection | Thread |
| Packaging Details | exporting packaging or as required. |
| Delivery Time | 45 work days |