Material | Brass |
---|---|
Thread | NPT,BSP,METRIC THREAD |
Size | 1/8,1/4,1/2 |
Packaging Details | box, pallet |
Delivery Time | 20 work days |
Material | Brass |
---|---|
Thread | NPT,BSP,METRIC THREAD |
FINISHING | NATURAL |
Packaging Details | box, pallet |
Delivery Time | 20 work days |
Material | Brass Hpb57-3 |
---|---|
Connection | Thread |
Finish | Sandblasting,natural |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Brass Hpb57-3 |
---|---|
Connection | Thread |
Thread | BSP,NPT,Metric Thread |
Finish | Natural |
Packaging Details | exporting packaging or as required. |
Material | Brass Hpb57-3 |
---|---|
Finish | Sandblasting,natural |
Connection | Male Thread |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Brass,aluminum,stainless Steel.carbon Steel |
---|---|
Thread | NPT,BSP,METRIC THREAD |
Size | 1/4",1/8",1/2",3/8" |
Packaging Details | exporting packaging |
Delivery Time | 25 work days |
Material | Brass Hpb57-3 |
---|---|
Finish | Sandblasting,natural |
Connection | Male Thread |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Brass Hpb57-3 |
---|---|
Finish | No Finishing |
Connection | Thread |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |
Material | Brass Hpb57-3 |
---|---|
Finish | No Finishing |
Connection | Thread |
Packaging Details | exporting packaging or as required. |
Delivery Time | 45 work days |